On this page
New Jersey: Measure consumption before attributing savings
Start with DOE FEMP: boiler purchasing, sizing and lifecycle analysis. The table below links this decision to the represented gas companies in New Jersey. It does not establish service or supplier availability for every account.
Build the operating baseline
Record actual billing periods, estimated readings, operating hours and occupancy or production. Separate space heating from process and hot-water use where the available data permits. Explain changes before comparing periods.
Reconcile engineering and procurement
Have qualified personnel evaluate controls, equipment and service capacity. Update the contracted volume forecast after a project and review tolerance or minimum-volume terms. Verify program eligibility and preapproval before treating an incentive as funded.
New Jersey utility application
| Gas service company | Contract component to revisit after load reduction | Primary reference |
|---|---|---|
| New Jersey Natural Gas | BGSS alternative versus third-party supply, fees and retained utility charges | Official program / tariff |
| PSE&G | BGSS alternative versus third-party supply, fees and retained utility charges | Official program / tariff |
| Elizabethtown Gas | BGSS alternative versus third-party supply, fees and retained utility charges | Official program / tariff |
New Jersey Natural Gas: the program detail behind this decision
The BPU’s commercial shopping guidance separates the regulated gas distributor from a licensed third-party supplier. Each gas company maintains its own tariff. Identify the Basic Gas Supply Service alternative and the supplier’s full terms for the same months; a license does not establish an accepted commercial offer. Program New Jersey.
Apply the evidence to an account file
After reducing forecast consumption, revisit BGSS alternative versus third-party supply, fees and retained utility charges. Ask whether the revised operating load changes Distribution company, commercial schedule and BGSS category or any conditions associated with BPU license, utility participation, term and renewal language.
Worked check: fixed charges do not fall with every therm
Assume hypothetical use of 10,000 therms at a constant $0.80 supply price and a $30 monthly supply fee. Modeled supply cost is $8,360. If use falls ten percent to 9,000 therms with the same price and fee, the total becomes $7,560: an $800 reduction, or about 9.57 percent of that supply total. This excludes delivery, taxes and project costs and proves no equipment result. The illustration shows why a percentage therm reduction is not automatically the same percentage dollar reduction.
Turn the review into a calculation
Build a monthly weighted budget. Enter documented assumptions in matching energy units. Keep any charge outside both supply offers separate; the result does not establish eligibility or an available quote.
Read the New Jersey utility guide for the wider service-company distinctions. Convert billed gas units using the bill’s heat-content factor when moving from volume to energy.
Sources and review notes
Reviewed October 16, 2026. Program information can change. Confirm the effective utility tariff, supplier availability and written offer before proceeding. Examples and planning tools are educational; they are not executable quotes or verified customer results.