On this page
Kentucky: Make the bid specification match the utility
Start with EIA: natural gas customer choice and eligibility. The table below links this decision to the represented gas companies in Kentucky. It does not establish service or supplier availability for every account.
Require an inclusion schedule
Ask bidders to mark commodity, capacity, balancing, taxes, utility transportation and account fees as included, excluded or variable. An unanswered field is an unresolved cost, not zero.
Compare risk as well as the modeled total
Read the volume measurement period, assignment process, early-exit calculation and renewal mechanism. Request a written calculation for a material overrun or closure rather than relying on a product name such as fixed or flexible.
Kentucky utility application
| Gas service company | Comparable price and fee scope | Primary reference |
|---|---|---|
| Columbia Gas of Kentucky | Utility gas cost versus supplier supply, with Mcf and therms reconciled | Official program / tariff |
| Atmos Energy Kentucky | GCA under sales versus transport, pool and supplier charges | Official program / tariff |
| Duke Energy Kentucky | Kentucky gas-cost adjustment versus supplier, transport and account charges | Official program / tariff |
| Louisville Gas and Electric | Gas Supply Clause under sales versus transportation, balancing and pooling items | Official program / tariff |
| Henderson Municipal Gas | Local monthly gas schedule and industrial pricing terms if applicable | Official program / tariff |
| City of Murray Natural Gas | City commercial gas schedule and applicable supply costs | Official program / tariff |
| Delta Natural Gas | Sales gas cost versus transportation, supplier and related fees | Official program / tariff |
Columbia Gas of Kentucky: the program detail behind this decision
Kentucky PSC publishes Columbia Customer Choice information. Columbia’s territory and class requirements matter: the program is not a statewide enrollment path for Atmos, Duke, LG&E, Delta or municipal accounts. Keep the bill’s Mcf units and its heat-content conversion visible when comparing a per-therm offer. Program Kentucky; Columbia Ky Current Tariff.
Apply the evidence to an account file
Give bidders the same specification for Utility gas cost versus supplier supply, with Mcf and therms reconciled. Ask who is responsible for Choice enrollment, current supplier participation and return conditions. Do not rank an incomplete answer as the cheapest complete offer.
Worked check: fees can reverse the lower rate
Assume hypothetical annual consumption of 10,000 therms. A costs $0.80 per therm plus $20 monthly: $8,240. B costs $0.76 plus $60 monthly: $8,320. B’s commodity price is lower, but its modeled supply total is $80 higher. Equal cost occurs at 12,000 annual therms under these constant-rate assumptions. These are invented inputs, not available offers, local tariffs or program thresholds. Delivery, tax, exit costs and any excluded components still require a separate review.
Turn the review into a calculation
Compare constant supply rates and fees. Enter documented assumptions in matching energy units. Keep any charge outside both supply offers separate; the result does not establish eligibility or an available quote.
Read the Kentucky utility guide for the wider service-company distinctions. Convert billed gas units using the bill’s heat-content factor when moving from volume to energy.
Sources and review notes
- EIA: natural gas customer choice and eligibility
- Kentucky PSC Columbia Choice
- Atmos Ky Tariff
- Duke Ky Tariff
- Lge Ky Tariff
- Henderson Gas
- Murray Gas
- Delta Ky Tariff
- Columbia Ky Current Tariff
Reviewed October 16, 2026. Program information can change. Confirm the effective utility tariff, supplier availability and written offer before proceeding. Examples and planning tools are educational; they are not executable quotes or verified customer results.