On this page
Florida: Measure consumption before attributing savings
Start with DOE FEMP: boiler purchasing, sizing and lifecycle analysis. The table below links this decision to the represented gas companies in Florida. It does not establish service or supplier availability for every account.
Build the operating baseline
Record actual billing periods, estimated readings, operating hours and occupancy or production. Separate space heating from process and hot-water use where the available data permits. Explain changes before comparing periods.
Reconcile engineering and procurement
Have qualified personnel evaluate controls, equipment and service capacity. Update the contracted volume forecast after a project and review tolerance or minimum-volume terms. Verify program eligibility and preapproval before treating an incentive as funded.
Florida utility application
| Gas service company | Contract component to revisit after load reduction | Primary reference |
|---|---|---|
| Peoples Gas System | Pool-manager commodity and administration charges plus utility transportation | Official program / tariff |
| CGS Energy / Clearwater municipal gas | Municipal gas rate and gas-cost component | Official program / tariff |
| Florida Public Utilities | Area-specific customer and distribution charges, supply and applicable adjustments | Official program / tariff |
| Gainesville Regional Utilities | Municipal gas customer, usage and supply components | Official program / tariff |
| Florida City Gas | Supply/pooled gas, customer charge and applicable transportation balancing charge | Official program / tariff |
| City of Tallahassee gas utility | Customer charge, non-fuel energy charge and fuel cost in CCF | Official program / tariff |
Peoples Gas System: the program detail behind this decision
Peoples Gas describes Natural Choice for nonresidential firm customers, with gas supply negotiated through participating pool managers. The utility retains the transportation role. Its community tariff can overlap another Florida gas company’s locality list, so a city listing alone does not identify which program serves a particular meter. Program Florida.
Apply the evidence to an account file
After reducing forecast consumption, revisit Pool-manager commodity and administration charges plus utility transportation. Ask whether the revised operating load changes Peoples Gas nonresidential firm service and annual-use billing category or any conditions associated with Participating pool manager, utility authorization and accepted enrollment.
Worked check: fixed charges do not fall with every therm
Assume hypothetical use of 10,000 therms at a constant $0.80 supply price and a $30 monthly supply fee. Modeled supply cost is $8,360. If use falls ten percent to 9,000 therms with the same price and fee, the total becomes $7,560: an $800 reduction, or about 9.57 percent of that supply total. This excludes delivery, taxes and project costs and proves no equipment result. The illustration shows why a percentage therm reduction is not automatically the same percentage dollar reduction.
Turn the review into a calculation
Build a monthly weighted budget. Enter documented assumptions in matching energy units. Keep any charge outside both supply offers separate; the result does not establish eligibility or an available quote.
Read the Florida utility guide for the wider service-company distinctions. Convert billed gas units using the bill’s heat-content factor when moving from volume to energy.
Sources and review notes
- DOE FEMP: boiler purchasing, sizing and lifecycle analysis
- Peoples Gas Natural Choice
- Clearwater Gas
- Fpu Current Tariff
- Gainesville Fl Gas
- Fcg Current Tariff
- Tallahassee Gas
Reviewed October 16, 2026. Program information can change. Confirm the effective utility tariff, supplier availability and written offer before proceeding. Examples and planning tools are educational; they are not executable quotes or verified customer results.